Directional drilling in the Bay of Plenty
HDD under anything. No trench.
What directional drilling is
Two pits. One drill line.
We drill a steered hole from one small pit to another, then pull your pipe or conduit back through it. The driveway, road or garden on top stays as it was.
- Up to 125 mmPipes and conduit.
- Any groundClay, rock or sand.
- About 600 mmUsually this deep. Deeper to clear other services.
- Our own crewDitch Witch JT5 and 922 rigs.


When to drill instead of trench
Anything you can't dig up.
- Under driveways, paths and pavers
- Under roads and footpaths
- Under houses and slabs
- Through banks and bush, like 50 m up a forest slope
What we handle
You connect, we do the rest.

Locate
We find existing services first.

Pits
We dig and reinstate the pits.

Drill and pull
Your pipe or conduit goes through.
Paperwork
We do the council or network paperwork.
You connect
We don't connect the pipe. That's your job, done your way.
Recent drilling
Real jobs, Bay of Plenty.

Pressure sewer up a forest slope near Tarawera
40 mm pressure sewer, 50 m long, 50 degrees up through forest.

Sewer on grade under a tar seal driveway
100 mm sewer drilled on grade. No reinstatement.

Rig set up beside the road
Questions
Straight answers. Call Joe if yours isn't here.
★★★★★
"It's always great dealing with contractors who simply turn up, do what they say they're going to do, and do it properly."
How long does a job take?
Most driveways take half a day. It varies with the job.
Do I need council consent?
Not for most private driveways. If a council or network permit is needed, we do the paperwork.
What size pipe can you pull?
Up to 125 mm.
Can you drill through rock?
Yes. Clay, rock or sand.
Got a drill job?
Send photos for a faster quote.
Amotai supplier. SiteWise Green 2026/27. OSHE.
Directional drilling in the Bay of Plenty
HDD under anything. No trench.
What directional drilling is
Two pits. One drill line.
We drill a steered hole from one small pit to another, then pull your pipe or conduit back through it. The driveway, road or garden on top stays as it was.
Pipes and conduit up to 125 mm
Clay, rock or sand
Usually about 600 mm deep, deeper to clear other services
Ditch Witch JT5 and 922 rigs, our own crew
When to drill instead of trench
Anything you can't dig up
Under driveways, paths and pavers
Under roads and footpaths
Under houses and slabs
Through banks and bush, like 50 m up a forest slope
What we handle
You connect, we do the rest
Locate existing services
Dig and reinstate the pits
Drill and pull the pipe or conduit
Paperwork [confirm what paperwork: council, utility, traffic management]
We don't connect the pipe. That's your job, done your way.
Recent drilling
Real jobs, Bay of Plenty
Pressure sewer, 50 m up a forest slope near Tarawera.
100 mm sewer drilled on grade under a tar seal driveway. No reinstatement.
Questions
-
[Most driveways take about half a day.] Longer runs are quoted with a time.
-
[Joe answered no. Confirm wording, for example: Not for the drilling itself. If your job needs a consent, your plumber or electrician will know.]
-
Up to 125 mm.
-
Yes. Clay, rock or sand.