Directional drilling in the Bay of Plenty

HDD under anything. No trench.

What directional drilling is

Two pits. One drill line.

We drill a steered hole from one small pit to another, then pull your pipe or conduit back through it. The driveway, road or garden on top stays as it was.

  • Up to 125 mmPipes and conduit.
  • Any groundClay, rock or sand.
  • About 600 mmUsually this deep. Deeper to clear other services.
  • Our own crewDitch Witch JT5 and 922 rigs.
Drill rig set up in a paved yard, no trench through the paving
Drill rig set up on a roadside grass verge, drilling instead of trenching the road

When to drill instead of trench

Anything you can't dig up.

  1. Under driveways, paths and pavers
  2. Under roads and footpaths
  3. Under houses and slabs
  4. Through banks and bush, like 50 m up a forest slope

What we handle

You connect, we do the rest.

Locating the drill head under the driveway

Locate

We find existing services first.

Pit with pipe ends ready for the plumber to connect

Pits

We dig and reinstate the pits.

Crew pulling new pipe back through the drill line

Drill and pull

Your pipe or conduit goes through.

Paperwork

We do the council or network paperwork.

You connect

We don't connect the pipe. That's your job, done your way.

Recent drilling

Real jobs, Bay of Plenty.

See our work
50 mDrill line exit pit in forest

Pressure sewer up a forest slope near Tarawera

40 mm pressure sewer, 50 m long, 50 degrees up through forest.

100 mm100 mm sewer pipe drilled on grade beside a tar seal driveway

Sewer on grade under a tar seal driveway

100 mm sewer drilled on grade. No reinstatement.

On siteOperator at the drill rig beside a fenced entry pit on a road verge

Rig set up beside the road

Questions

Straight answers. Call Joe if yours isn't here.

★★★★★

"It's always great dealing with contractors who simply turn up, do what they say they're going to do, and do it properly."
BradPlumber
How long does a job take?

Most driveways take half a day. It varies with the job.

Do I need council consent?

Not for most private driveways. If a council or network permit is needed, we do the paperwork.

What size pipe can you pull?

Up to 125 mm.

Can you drill through rock?

Yes. Clay, rock or sand.

Got a drill job?

Send photos for a faster quote.

Amotai supplier. SiteWise Green 2026/27. OSHE.

Directional drill rig on site, no trench through the paving

Directional drilling in the Bay of Plenty

HDD under anything. No trench.

Drill rod and reamer in the exit pit

What directional drilling is

Two pits. One drill line.

We drill a steered hole from one small pit to another, then pull your pipe or conduit back through it. The driveway, road or garden on top stays as it was.

  • Pipes and conduit up to 125 mm

  • Clay, rock or sand

  • Usually about 600 mm deep, deeper to clear other services

  • Ditch Witch JT5 and 922 rigs, our own crew

When to drill instead of trench

Anything you can't dig up

  • Under driveways, paths and pavers

  • Under roads and footpaths

  • Under houses and slabs

  • Through banks and bush, like 50 m up a forest slope

Paved driveway left untouched after drilling

What we handle

You connect, we do the rest

  • Locate existing services

  • Dig and reinstate the pits

  • Drill and pull the pipe or conduit

  • Paperwork [confirm what paperwork: council, utility, traffic management]

We don't connect the pipe. That's your job, done your way.

Pit with pipe ends ready for the plumber to connect

Recent drilling

Real jobs, Bay of Plenty

  • Pressure sewer, 50 m up a forest slope near Tarawera.

  • 100 mm sewer drilled on grade under a tar seal driveway. No reinstatement.

Operator at the drill rig controls beside a fenced entry pit on a road verge

Questions

Got a drill job?

Send photos for a faster quote